For an existing Siemens-process plant, start with the deposition reactor, then check heat recovery, gas recycling and utility loads. A 2025 Fraunhofer ISE study puts deposition electricity at roughly 35–45 kWh per kilogram of solar-grade polysilicon in its process model. That makes the reactor the largest single electrical load to investigate. For new capacity, compare Siemens and fluidized-bed reactor (FBR) routes separately; changing the production route is not a routine furnace upgrade.[1]

At an actual output of 10,000 tonnes a year, every 1 kWh/kg reduction saves 10 million kWh annually. At an assumed electricity price of RMB 0.32/kWh, that is RMB 3.2 million before project costs.

How Much Electricity Does Polysilicon Use?

Fraunhofer ISE reports a 2024 solar-grade industry value of 54.5 kWh/kg in its historical series. Its separate process model uses a 2023 reference of about 60–70 kWh/kg. These are different datasets, not interchangeable readings from one plant. The study was commissioned by Wacker Chemie AG and published on 18 August 2025.


Solar-grade electricity breakdown in the Fraunhofer ISE process model, Table 5
Process Electricity, kWh/kg Accounting note
Trichlorosilane synthesis About 9 Allocated per kilogram of solar-grade polysilicon
Chemical vapour deposition About 35–45 The largest individual electricity demand
Distillation None separately allocated The model supplies heat from reactor waste-heat recovery; distillation is not energy-free
Other systems About 16 Includes vent-gas recovery condensation, hydrogen production, scrubbers and ancillary services
Total reference About 60–70 A 2023 process reference, not a minimum or a guaranteed plant result

The same study estimates electronic-grade production at 92–124 kWh/kg, with some special products requiring up to about 200 kWh/kg. Do not use those figures to judge a solar-grade line without accounting for product requirements.[1]

Where Existing Plants Can Reduce Consumption

Deposition Reactors

Compare complete batches, not just peak power. Record reactor electricity, batch duration, saleable output and rejected material. A lower power setting is not a saving if it extends the batch or reduces usable yield.

Review power profiles, gas distribution, rod layout and heat loss together. The IEA identifies larger furnaces, changes to furnace-wall materials, more silicon rods and gas-mixture adjustments as contributors to past Siemens-process efficiency gains.[2] Tongwei’s high-purity crystalline silicon production also uses the modified Siemens process. Any energy trial must preserve the required impurity limits and downstream crystal-growth performance.

Heat Recovery

Measure the heat source and the steam demand before sizing a recovery project. Record coolant temperatures, flow, available heat, required steam pressure and the hours when supply and demand overlap. A large heat stream is not necessarily hot enough for every duty.

Fraunhofer’s model describes 70–85% of CVD electricity as recoverable waste heat. That is a heat-recovery estimate, not a promise of an equivalent cut in the electricity bill. Verify the result through lower purchased steam or fuel use, and subtract any extra pumping electricity.[1]

Gas Recovery and Distillation

Track fresh silicon feed, hydrogen make-up, chlorosilane recycle, purge losses and steam use per kilogram of saleable product. A change that reduces fresh feed may still increase compression or separation duty. Compare the full loop rather than one recovery percentage.

Do not infer material savings from a recovery-rate change alone. A move from 97% to 99.5%, for example, needs a defined stream, composition and mass balance before it can be converted into kilograms of feed saved. Changes to gas ratios, pressures or purge rates require process-safety review.

Cooling and Other Utilities

Submeter cooling pumps, chillers, compressors and hydrogen production. Compare their electricity use during production, standby and maintenance. Check throttled pumps, excessive air pressure, leaks and equipment left running without demand before buying replacements.

Keep water savings separate from electricity savings. Tongwei’s water-management programme, for example, sets a target to reduce water consumption intensity per unit of silicon feedstock by 10% by 2030 against a 2022 baseline. That is a published target, not a measured 10% reduction in plant electricity.

When to Compare FBR

FBR produces granular silicon rather than Siemens-process rods. The IEA identifies it as a lower-energy route, while also noting scale-up and product-quality considerations in its 2022 assessment. Those historical observations are not a current qualification result for every supplier.[2]

For a new project, request whole-plant electricity and steam data covering feed-gas preparation, deposition, recovery and utilities. Compare saleable output, impurity specifications, customer qualification, capital cost and downtime. Reactor-only figures cannot establish which production route is lower-cost.

What the Savings Are Worth

The following calculation assumes 10,000 tonnes of actual annual production, unchanged product quality and an electricity price of RMB 0.32/kWh. The reductions are scenarios, not claimed retrofit results.

Illustrative annual electricity savings
Reduction Electricity saved Gross cost saving
1 kWh/kg 10 million kWh RMB 3.2 million
3 kWh/kg 30 million kWh RMB 9.6 million
5 kWh/kg 50 million kWh RMB 16 million

Annual electricity saving = reduction in kWh/kg × actual annual output in kg. Deduct additional maintenance, consumables and utility costs, then account for installation downtime. Do not double-count overlapping savings from furnace, cooling and heat-recovery projects.

How to Verify a Plant Trial

Use a trial record with the same meter boundary and product grade before and after the change. Log these six items:

  • Meter IDs, calibration status and the start and end readings.
  • Total output, saleable output and rejected material.
  • Batch duration, operating load, starts and stops.
  • Electricity, purchased steam, fuel and hydrogen use.
  • Cooling conditions and any other equipment changes.
  • Impurity-test results and downstream acceptance.

If a batch uses 350,000 kWh to produce 10,000 kg of saleable silicon, its measured intensity is 35 kWh/kg. If only 9,500 kg is saleable, the intensity rises to 36.8 kWh/kg. Yield loss can erase an apparent energy gain.

This is a worked example, not a reported factory trial. A credible project case should publish the before-and-after readings, trial period, output basis and quality results—not just a percentage saving.


Lower Carbon Is a Separate Calculation

At 55 kWh/kg, an assumed electricity emission factor of 0.8 kg CO₂e/kWh gives 44 kg CO₂e per kilogram of silicon. At an assumed 0.2 kg CO₂e/kWh, it gives 11 kg. The meter still reads 55 kWh/kg. These examples cover electricity-related emissions only, not the full product footprint.

For a product carbon comparison, check the reporting boundary, electricity-accounting method and verification scope. ISO 14067 provides requirements for quantifying and reporting product carbon footprints; it does not turn a green-power purchase into a complete life-cycle assessment.[3] Company-level figures in Tongwei’s ESG reports should likewise be distinguished from a product-specific assessment.

Discuss silicon feedstock requirements

Include your target impurity limits, crystal-growth process, monthly volume and any carbon-documentation requirements in your enquiry to Tongwei.

Enquire About Silicon Feedstock