BLOG

Siemens Process vs. FBR Polysilicon: How Do Quality and Production Costs Compare

The Siemens process has a long qualification record in high-purity polysilicon. FBR generally uses less energy and produces granules suited to automated feeding. Neither route guarantees better material: buyers need batch impurity results and crystal-growth trials. FBR can offer lower production costs, but a fixed “one-third cheaper” claim does not hold across all plants.[1]

Process Differences

In the Siemens process, silicon deposits on heated silicon rods. Producers remove the rods after each batch and usually break them into chunks. In silane-based FBR production, silicon deposits on small particles suspended by gas flow. The particles grow into granules that can be withdrawn during operation.[1]

Siemens and silane-based FBR production
Comparison Siemens Process FBR Process
Product form Rods, usually broken into chunks Granules
Production pattern Batch deposition Continuous feeding and withdrawal during a production run
Handling Chunk sizing, cleaning and contamination control Particle sizing, fines control and feeding-system compatibility
Cost advantage Depends on plant efficiency, energy prices and asset costs Lower energy requirements and potential downstream feeding benefits
Quality acceptance Batch testing and customer qualification Batch testing and customer qualification

Continuous operation does not mean maintenance-free operation. Cleaning intervals, availability and output depend on the reactor design and plant operating record.

Quality and Purity

FBR is not automatically a lower-purity route. NREL’s manufacturing study modeled Siemens products at 9N and up to 11N, and FBR products from 8N to 11N. These are the study’s modeled grades—not a guarantee for every supplier or batch.[1]


A headline purity figure also leaves out information that matters to crystal growth. A low result for five selected metals does not establish total purity or confirm acceptable boron, phosphorus and carbon levels.

What Buyers Should Check

  • Boron and phosphorus: request separate results, units, detection limits and test methods.
  • Carbon and metals: distinguish bulk impurities from surface contamination and identify the elements included in any reported total.
  • Physical quality: record particle or chunk size, fines, packaging condition and any required surface treatment.
  • Batch consistency: compare several recent production batches rather than one selected sample.

Do not compare ppba and ppbw as if they were the same unit. One expresses an atomic ratio; the other expresses a mass ratio. Reports with different analytical methods also need technical review before their results can be treated as equivalent.

Tongwei identifies the modified Siemens process on its high-purity crystalline silicon product page. That establishes the production route; a purchase specification still needs batch-level limits and agreed acceptance tests.

Granules in Crystal Growth

Granules can fill spaces between chunks and increase the initial crucible charge. NREL also identifies their suitability for continuous Czochralski feeding. These benefits can improve productivity, but the study does not establish a universal refill-time saving or a standard blending percentage.[1]

For TOPCon or HJT supply chains, compare resistivity distribution, crystal yield, wafer quality and downstream cell results against the buyer’s existing qualified material. The process name alone cannot establish cell efficiency.

Production Costs

NREL’s first-half 2018 benchmark provides a documented comparison of the two routes. It modeled new plants at approximately 15,000 metric tons per year and estimated lower cash costs for FBR. The ranges overlap, so they do not support a fixed saving for every producer.[1]

Historical NREL benchmarks—not current market prices
Measure Siemens FBR
Modeled cash cost USD 8–15/kg USD 7–10/kg
Solar-grade energy input 50–65 kWh-equivalent/kg, including electricity and steam 30–40 kWh-equivalent/kg, including electricity and natural gas
Electronic-grade Siemens energy input 65–80 kWh-equivalent/kg, including electricity and steam No separate electronic-grade energy range in this table

Energy-equivalent figures are not electricity-meter readings. Do not multiply them by an electricity tariff without separating electricity, steam and fuel. Do not add utilities again if the reported total already includes them.

Electricity prices remain a major cost driver. In its 2022 supply-chain analysis, the IEA reported that electricity accounted for more than 40% of polysilicon production costs. That is a dated sector estimate, not a fixed cost share for either route.[2]

Electricity Savings Example

Assume two plants report comparable whole-plant electricity use of 60 and 30 kWh/kg. At RMB 0.40/kWh, the difference is RMB 12/kg: (60 − 30) × 0.40. At RMB 0.25/kWh, it falls to RMB 7.50/kg. These are illustrative inputs, not verified plant results.

A full cost comparison must also include feedstock, gases, maintenance, labor, depreciation and capacity utilization. A supplier’s cash cost cannot be compared directly with another supplier’s all-in cost or selling price.

Purchase Cost and Yield

A lower feedstock price can disappear if more material fails to become saleable output. Consider a simplified example that excludes recycling credits and processing costs:

  • Material A costs RMB 30/kg and delivers 95% saleable yield: feedstock cost is RMB 31.58 per saleable kilogram.
  • Material B costs RMB 28/kg and delivers 88% saleable yield: feedstock cost is RMB 31.82 per saleable kilogram.

Material B is cheaper to buy but slightly more expensive on this yield-adjusted basis. An actual purchasing model should include recoverable scrap, furnace time, crucible use and downstream rejects.

A Qualification Trial

Keep the furnace recipe, crucible specification, target resistivity and measurement methods consistent. Compare the candidate material with an established control, and test more than one batch. If blending is proposed, record the exact blend by mass.

Log charging time, interruptions, crystal yield, resistivity distribution, wafer rejects and cell results. Set acceptance limits before the trial. There is no universal 30% starting blend, 1.5% yield tolerance or resistivity range that suits every production line.


Carbon Footprint

Lower energy use can reduce emissions, but electricity supply matters too. The IEA identifies both manufacturing efficiency and lower-carbon electricity as drivers of reduced PV manufacturing emissions.[2]

Request product-level results in kg CO2e/kg with the same lifecycle boundary, reporting period and electricity-accounting method. Corporate disclosures, including Tongwei’s ESG reports, provide operational context but should not be treated as a substitute for a product-specific footprint assessment.

Multiplying an emissions difference by a carbon price gives a scenario value. It does not, by itself, establish a tradable credit, cash saving or EU import charge.

Preparing a polysilicon purchase specification?

Send Tongwei’s silicon business team your impurity limits, required material size, monthly volume and delivery location. Use those requirements to discuss product specifications and supply terms.

Discuss Polysilicon Requirements