BLOG

How Do You Compare Solar Module Reliability

Solar panels often look almost identical.

Two modules may use similar cell technology. Both may offer a 30-year performance warranty. Their efficiencies may differ by less than 0.5%.

That does not mean they will age in the same way.

One module may lose power slowly for decades. Another may develop cracked cells, corrosion, delamination, hot spots, or electrical problems much earlier.

So how do you compare solar module reliability?

Do not start with brand, wattage, or warranty length.

Start with five things:

  • Test results

  • Failure risks

  • Climate fit

  • Manufacturing control

  • Field data

Reliability is also more than power degradation.

Power degradation is the gradual loss of electrical output.

Failure rate tells you how often modules develop defects that need investigation, repair, or replacement.

Durability describes how well the materials and construction handle heat, moisture, UV, voltage, and mechanical stress.

Safety means the module continues to provide proper electrical, fire, and mechanical protection.

A module can lose power slowly but still suffer connector or junction-box failures. Another may have very few physical failures but lose power slightly faster each year.

That is why module reliability cannot be judged by one percentage.



Check the Exact Module


Never judge a solar panel only by the manufacturer's name.

A large manufacturer may sell many module families. One model may use glass on both sides. Another may use a polymer backsheet. One may use POE encapsulant, while another uses EVA.

Cell technology, glass thickness, module size, frame design, internal connections, junction boxes, and connectors may also be different.

These details can change how the module responds to heat, humidity, voltage, impact, and mechanical load.

Write down the full model number.

For example:

ABC-XXX-72H-585W

Do not automatically accept a test report for a "similar" model.

A small change in a model code may indicate a different component or construction. However, the code alone does not tell you what changed.

Ask whether the tested model and the product you are buying are covered by the same certificate or approved design family.

Some wattage versions may share the same qualified design. A more important change, such as different glass, cells, encapsulant, connectors, or junction boxes, may need further assessment.

You can start by checking the manufacturer's current product range. Tongwei's high-efficiency module product page, for example, shows the current module families and their main applications.

For a large project, also check:

  • Factory location

  • Production line

  • Manufacturing date

  • Bill of materials, or BOM

  • Certificate scope

  • Test report date

  • Current product version

Current specifications, installation documents, warranties, and technical files should be checked together. Tongwei's module download center separates product specifications, installation and maintenance documents, warranties, and white papers.

For purchased Tongwei modules, the module authenticity query also allows a product barcode to be checked.

The first question is simple:

Does the evidence actually apply to the module I am buying?

Understand What IEC 61215 Proves

IEC 61215 is one of the main standards used for terrestrial PV module design qualification.

Passing IEC 61215 is important.

But it does not prove that a module will last exactly 25 or 30 years.

IEC 61215-1 states that useful service life depends on module design, environment, and operating conditions. It also says the test results should not be treated as a quantitative prediction of module lifetime.[1]

In simple terms, IEC 61215 asks:

Can this module design survive a defined set of tests and remain within the required limits?

It does not say:

This module is guaranteed to operate without problems for 30 years.

If two modules both pass, look at the actual test information.

Imagine Module A loses 0.8% of maximum power after a test and Module B loses 4.5%.

Before deciding that Module A is better, check whether the test conditions were the same.

  • Was the same test used?

  • Was the stress level the same?

  • Was the duration the same?

  • Was the same voltage polarity or load direction used?

  • Were similar power measurement methods used?

  • Were similar inspections performed after the test?

If Module A completed a basic test and Module B completed a much longer test, the two percentages are not a fair direct comparison.

Compare the test conditions before comparing the result.

Useful reports should show:

  • Initial maximum power

  • Final maximum power

  • Percentage power change

  • Test conditions and duration

  • Visual inspection results

  • Insulation results where relevant

  • EL images where relevant

  • Sample identification

  • Laboratory information

Also ask how the test samples were selected.

A development sample chosen by the manufacturer does not answer exactly the same question as a module randomly selected from commercial production.

Independent laboratory testing can provide useful additional confidence, but the laboratory, method, and sample identity still matter. ISO/IEC 17025 sets requirements for the competence, impartiality, and consistent operation of testing and calibration laboratories.[2]

Extended testing can also provide more information than a simple pass mark. As an example of the type of test detail buyers may see, Tongwei's summary of its 2025 Kiwa PVEL result lists TC600, DH2000, PID192, LeTID486, mechanical stress, 40 mm hail stress, PAN performance, and UV120 testing.

A manufacturer summary is useful for finding relevant test areas. For a large purchase, buyers should still confirm the applicable model and review the detailed evidence available for the supplied product.


Check Safety Separately


IEC 61730 deals with PV module safety.

IEC 61730-2 defines safety test requirements and pass criteria intended to find problems that could lead to fire, electric shock, or personal injury.[3]

Safety and power output are not the same thing.

A module may still produce electricity while developing:

  • Damaged insulation

  • A cracked backsheet

  • A poor electrical connection

  • A loose junction box

  • Another safety-related defect

A panel that still produces 90% of its original power is not acceptable if its electrical insulation is unsafe.

When reviewing a module, ask three separate questions:

  • Does it maintain power?

  • Does it remain physically sound?

  • Does it remain safe?

Do not use a performance warranty as a replacement for safety certification.


Compare Real Power Loss, Not Just the Warranty Curve


Many buyers begin with the performance warranty.

For example, a warranty might allow:

  • 1% degradation in the first year

  • 0.4% per year afterward

  • 87.4% remaining output after 30 years

The mathematics works: 1% in year one plus 0.4% for the following 29 years gives a total allowed loss of 12.6%.

But a warranty curve is a contractual limit.

It is not measured proof that the average module will follow exactly that line.

Look for field measurements.

A study of 834 fielded PV modules covering 13 module types from seven manufacturers in three climates over five years found mean and median degradation rates of about 0.62% and 0.58% per year. The study also found that some module types showed nonlinear degradation and seasonal changes.[4]

This does not mean every solar module should lose 0.58% per year.

The useful lesson is that degradation is not always a perfectly straight line.

A module may lose some power early and then become more stable. Another may perform well at first and develop a problem later.


Check Early-Life Power Changes


Some crystalline-silicon cells can experience light-induced degradation, usually called LID.

IEC 63202-1 describes methods for measuring LID in crystalline-silicon PV cells by comparing maximum power before and after controlled light exposure.[5]

Light and elevated temperature-induced degradation, or LETID, is a different effect. IEC TS 63342 covers a current-injection method for detecting LETID in crystalline-silicon modules.[6]

You do not need to become a solar-cell specialist.

Ask one practical question:

Does the reported degradation separate early power changes from longer-term aging?

Check the Number of Modules

Results from 10 modules are less convincing than results from hundreds or thousands of modules.

A small sample can still reveal a failure mechanism, but a few good modules do not show how consistent an entire production population is.

Ask:

  • How many modules were installed?

  • How many were measured?

  • How were they selected?

  • Were failed modules included?


Check the Number of Years


Two or three years of good operation is encouraging.

It is not the same as 15 years of field data.

However, older field data must still be technically relevant to the current product.

A new module may use different cells, glass, encapsulants, interconnections, or module dimensions.

Company history and product-specific field history are not the same thing.

Check the Climate

A module performing well in a dry climate may behave differently in a hot, humid location.

Check whether the field site had conditions similar to your project:

  • Temperature

  • Humidity

  • Rain and moisture

  • UV exposure

  • Wind

  • Snow

  • Hail

  • Salt

  • Agricultural chemicals

Field data from another climate is not useless. It simply answers a different question.


Check Failure Data as Well as Average Degradation


Average power loss can hide physical failures.

Consider a hypothetical example.

Module A loses an average of 0.3% power per year, but 3% of the observed modules develop junction-box failures that require replacement.

Module B loses 0.5% per year, but only 0.1% of the observed modules require replacement for physical defects.

Which is more reliable?

There is not enough information to answer with one number.

A homeowner with difficult roof access may care more about replacement frequency. A utility project may compare energy loss, maintenance cost, downtime, failure type, and safety risk.

Also ask what happened to failed modules.

If failed modules were removed and the final analysis included only surviving modules, the average degradation result may not show the full failure picture.

IEA PVPS guidance explains that module degradation and service-life estimates depend on the materials, operating conditions, climate, degradation mechanism, and modelling method. It also notes that real degradation is often nonlinear.[15]


Check Cell Cracks and EL Images Together


Silicon solar cells are thin and brittle.

They can crack during:

  • Manufacturing

  • Packaging

  • Transport

  • Unloading

  • Installation

  • Wind loading

  • Snow loading

Not every crack causes immediate power loss.

A cracked area may still carry current at first. After repeated heat, cold, and movement, the crack may grow or part of the cell may become electrically disconnected.

Electroluminescence, or EL, imaging is commonly used to find cracks and inactive areas that may not be clear in a normal photograph.

IEC TS 60904-13 specifies methods for capturing and processing module EL images and provides guidance for interpreting visible features.[7]

Possible warning signs include:

  • Large dark cell areas

  • Long cracks

  • Repeated parallel cracks

  • Broken cell corners

  • Dark strings

  • Growing inactive areas

Do not treat every brightness difference as a failed cell.

EL appearance can change with cell technology, applied current, camera settings, image processing, and electrical conditions.

The most useful questions are:

  • What changed between the before and after images?

  • Does the same pattern appear in many modules?

  • Is part of a cell becoming electrically inactive?

One damaged module may have been mishandled.

If many modules show a similar crack in the same location, the problem is less likely to be random.

For large shipments, comparing factory EL images with delivery inspection images can also help show whether damage appeared during transport or handling.


Check Hot Spots


A hot spot is an area of a module that becomes hotter than the surrounding surface.

Possible causes include:

  • Cell cracks

  • Partial shading

  • Electrical mismatch

  • Damaged cells

  • Poor connections

  • Reverse-bias conditions

A small temperature difference does not automatically mean the module has failed.

A severe or persistent hot area needs investigation.

Infrared cameras are often used to inspect operating arrays, but test conditions matter.

Sunlight level, wind, moving clouds, reflections, module angle, and camera settings can affect the image.

Useful inspection information includes:

  • Maximum local temperature

  • Temperature difference

  • Location of the hot area

  • Sunlight and operating conditions

  • Visible damage

  • Power change

  • EL results where needed

A thermal image usually shows where a problem may be.

It does not always show why the problem happened.

A hot cell area may lead to EL or electrical testing. A hot connector requires a different inspection of the contact, crimp, and connection resistance.

Do not replace a module only because one area looks red on a thermal image.

Find the cause first.


Check Damp Heat and Multi-Stress Testing


Heat and moisture are major stresses for solar modules.

Moisture can contribute to:

  • Metal corrosion

  • Loss of adhesion

  • Delamination

  • Insulation problems

  • Cell degradation

  • Electrical leakage

A commonly referenced IEC 61215 damp-heat qualification condition is 1,000 hours at 85°C and 85% relative humidity.[8]

When reviewing damp-heat results, check:

  • Test duration

  • Temperature

  • Humidity

  • Power change

  • Visual defects

  • Insulation results

  • EL results where relevant

Some extended tests continue beyond 1,000 hours.

More test hours give information about the module's response to more laboratory stress.

But 2,000 hours does not mean "twice the outdoor life" of 1,000 hours.

Do not convert damp-heat hours directly into years in the field.

Real modules also face several stresses at the same time or one after another.

For example, a polymer exposed to UV and heat may respond differently when it later experiences moisture or mechanical load.

IEC TR 63279 reviews sequential and combined accelerated stress testing designed to reveal field degradation modes that single-factor or steady-state tests may not show.[9]

A long single test and a multi-stress test sequence answer different questions.


Check Thermal Cycling


A solar module heats up and cools down repeatedly.

The materials inside it do not all expand and contract by exactly the same amount.

Glass, copper, silicon, aluminum, and polymers behave differently as temperature changes.

Repeated temperature cycles can place stress on joints and material interfaces.

Thermal cycling can help reveal:

  • Solder or interconnection fatigue

  • Broken electrical connections

  • Cell cracks

  • Adhesion problems

  • Increasing electrical resistance

When comparing reports, check both the number of cycles and what changed after the test.

Review:

  • Maximum power

  • Electrical resistance where reported

  • Fill factor where reported

  • EL images

  • Connection condition

  • Visual defects

  • Insulation results

A small power change does not always mean nothing changed inside the module.

New cracks or increasing resistance may appear before a large power loss becomes obvious.


Check PID


PID means potential-induced degradation.

It can occur when high system voltage creates electrical stress between the solar cells and other parts of the module or system.

The exact mechanism depends on the cell and module technology.

When a datasheet says "anti-PID" or "excellent PID resistance," ask for the test details.

Check:

  • Test voltage

  • Voltage polarity

  • Temperature

  • Humidity

  • Test duration

  • Initial power

  • Final power

IEC TS 62804-1:2025 covers PID detection test methods for crystalline-silicon modules. IEC also makes clear that these tests assess PID sensitivity under defined test conditions; actual durability under system voltage stress still depends on the operating environment and the module's electrical potential relative to ground.[10]

Think about three things:

  The module: cells, insulating layers, encapsulant, glass, and construction

  The system: voltage and electrical design

  The environment: heat and moisture

An "anti-PID" label does not mean PID is impossible.

Look at the actual test conditions and result.


Check Materials and Module Construction


Delamination

A solar module contains several bonded layers.

Delamination means some of those layers begin to separate.

It may appear as:

  • Bubbles

  • Cloudy areas

  • Edge separation

  • Lifting layers

  • Changes around cells

  • Separation near the junction box

The location matters.

Edge separation may create a path for moisture. Separation over active cell areas may affect light transmission or show that a material interface is becoming unstable.

Ask:

  • Where is the defect?

  • Is it growing?

  • Is power changing?

  • Is insulation affected?

A single photograph shows the condition at one time.

Repeated inspections show whether the defect is stable or getting worse.

Polymer Backsheets and UV

Many solar modules use a polymer backsheet.

Possible signs of backsheet aging include:

  • Cracking

  • Yellowing

  • A chalk-like surface

  • Peeling

  • Blisters

  • Loss of adhesion

A serious backsheet crack can be more than a cosmetic problem because the backsheet is part of the module's environmental and electrical protection.

Do not judge a backsheet only by a short polymer name.

Many backsheets have several layers. Two products using the same general material abbreviation may still have different structures, thicknesses, suppliers, or formulations.

IEC TS 62788-7-2 defines accelerated weathering procedures for polymeric PV materials and focuses particularly on backsheets and encapsulants.[11]

UV, heat, moisture, lamination conditions, and compatibility with nearby materials can all affect polymer aging.

Glass-Glass Modules

Glass-glass modules use glass on both the front and rear sides.

They may avoid some polymer-backsheet failure risks.

But "dual glass" does not automatically mean "more reliable."

Check:

  • Front glass thickness

  • Rear glass thickness

  • Encapsulant

  • Edge design

  • Frame design

  • Cell spacing

  • Interconnection design

  • Junction-box attachment

  • Approved mounting method

Glass-glass modules can still experience cell cracks, delamination, corrosion, PID, hot spots, and junction-box problems.

A product page can help you identify the design being discussed. For example, Tongwei's TWMNF-66QD module page lists product-specific features such as crack resistance, shading behaviour, and bifaciality.

These product details help identify what to investigate. They are not a replacement for test reports.

The useful question is not simply:

Is it glass-glass?

Ask:

Does this complete module design have good evidence for the risks at my site?

Match Special Tests to the Installation Site

You do not need every possible reliability test to carry the same weight.

Start with the main risks at the installation location.

Hail

If the project is in a high-hail area, check the actual hail test conditions.

  • Hailstone diameter

  • Impact speed

  • Impact location

  • Number of impacts

  • Visible damage

  • Power change

  • EL damage

  • Insulation results

A 25 mm hail test is not the same as a 45 mm or 55 mm test.

IEC TS 63397 defines additional testing guidelines for modules likely to face hail stress beyond the normal scope of the IEC 61215 series and is intended to help with module selection in higher-risk hail regions.[12]

Do not stop at "the glass did not break."

Cells underneath intact glass can still be checked for new cracks with EL imaging.

Salt

Coastal sites may face increased corrosion risk from salt.

IEC 61701 describes test sequences used to determine PV module resistance to salt-mist corrosion.[13]

Check the frame, exposed metal, junction box, connectors, and grounding points.

Also remember that a module salt-mist test does not prove that every rail, bolt, or electrical enclosure in the complete system is suitable for a coastal location.

Ammonia

Modules installed near livestock and poultry facilities may face higher ammonia exposure.

IEC 62716 provides test sequences for determining module resistance to ammonia and specifically considers wet atmospheres with high concentrations of dissolved ammonia.[14]

A module installed directly on an animal building may face different exposure from a ground-mounted solar project several kilometres away.

Look at the real site conditions.

High Operating Temperature

Some mounting methods and climates can lead to unusually high module operating temperatures.

IEC TS 63126:2025 provides additional qualification guidance for modules, components, and materials used at higher operating temperatures beyond the normal IEC 61215 and IEC 61730 scope.[16]

Do not buy the module with the largest number of test reports.

Give more attention to the tests that match the main risks at your site.

Tongwei's application pages for residential rooftops, commercial and industrial projects, and utility-scale projects also show why module format and application should be considered together.

Check Mechanical Load and Mounting

Datasheets often show mechanical load values such as 5,400 Pa and 2,400 Pa.

Do not simply choose the module with the larger number.

Check how the module was mounted during the test.

Clamp location changes how force moves through the frame and module.

Review the installation manual for:

  • Number of clamps

  • Clamp length

  • Clamp position

  • Rail direction

  • Approved mounting holes

  • Maximum overhang

A load result under one mounting arrangement does not automatically apply to every other arrangement.

A module load rating also does not replace structural calculations for the roof or solar project.

Wind and snow loads depend on the complete structure, site, terrain, rails, and fasteners.

Static and repeated loads are also different.

IEC TS 62782 provides a cyclic dynamic mechanical load test that applies alternating positive and negative loads. The test can be used to evaluate whether cells, interconnections, electrical bonds, or edge seals are vulnerable to mechanical stress.[17]

Post-load EL imaging can be useful because a module may look normal from the outside while cells inside have developed cracks.

Check Connectors and Installation Quality

A reliable module can still be damaged during installation.

Common risks include poor handling, wrong clamp positions, and badly assembled connectors.

A poor electrical connection creates resistance.

Resistance creates heat.

Heat can further damage the connection.

Do not assume two connectors are compatible just because they physically fit together.

Connector systems may use different:

  • Contact shapes

  • Materials

  • Dimensions and tolerances

  • Sealing designs

  • Assembly tools

Ask whether the mated connector combination is approved or specified for the installation.

Field-made connections also need the correct cable, contact, strip length, crimp tool, and assembly process.

Handling is equally important.

Tongwei's official PV module installation manual warns against standing or walking on modules, dropping modules, exposing them to strong impacts, and lifting modules by their junction boxes or wires. It also gives model-specific clamp positions and load information.

For a homeowner, ask the installer:

  • Do you follow the current module installation manual?

  • How are modules carried onto the roof?

  • Are workers allowed to stand on modules?

  • How are clamp positions checked?

  • How is connector compatibility controlled?

Clear answers are more useful than simply hearing that the installer is "experienced."

Read Both Warranties

Solar modules usually have two different warranty concepts.

Product Warranty

This normally covers defined defects in materials or workmanship.

Performance Warranty

This normally covers power output falling below a stated level.

Do not mix them together.

A junction-box, frame, backsheet, or delamination problem may be a product-warranty issue.

Excessive power loss may be a performance-warranty issue.

Read the full warranty and check:

  • Who can make a claim

  • Required proof of purchase

  • Serial-number requirements

  • Testing requirements

  • Who pays for testing

  • Shipping costs

  • Removal costs

  • Reinstallation costs

  • Labor coverage

  • Warranty start date

  • Transfer rules

  • Repair, replacement, or financial remedy

  • What happens if the original module is discontinued

A manufacturer may provide a replacement module without paying the cost of removing and reinstalling the old one.

An "equivalent" replacement may also have a different size, wattage, voltage, current, appearance, or connector.

This does not automatically make the warranty poor.

It means you should understand what the warranty actually provides.

Also identify the legal company responsible for the warranty.

Current Tongwei module warranty documents can be found through the official warranty download page.

A long warranty is a contract.

It is not a laboratory reliability result.

Check Factory Control and Material Changes

A good module design can still have problems if manufacturing is inconsistent.

Important factory controls include:

  • Incoming material inspection

  • Cell inspection

  • Interconnection control

  • Lamination

  • Glass cleaning

  • Encapsulant storage

  • Junction-box bonding

  • Frame assembly

  • EL inspection

  • Flash testing

  • Traceability

  • Non-conformance handling

IEC 62941 sets out best practices for product design, manufacturing processes, and the selection and control of materials used to manufacture qualified PV modules.[18]

Do not only ask whether the factory performs EL inspection.

Ask when it is performed.

EL before lamination, after lamination, and after final assembly can find different problems.

Traceability also matters.

If 200 modules develop the same fault, serial-number and production records can help identify whether they came from the same line, time period, or material batch.



Check BOM Changes


BOM means bill of materials.

A module may keep the same model name while an approved material or supplier changes.

Possible changes include:

  • Glass supplier

  • Encapsulant

  • Backsheet

  • Cells

  • Junction box

  • Connector

A material change is not automatically a problem.

The important question is how the change was controlled.

IEC TS 62915 provides an approach for maintaining design and safety qualification when a previously assessed PV module design is modified.[19]

IEC TS 63209-1 also provides a standardized method for evaluating longer-term module reliability and comparing different BOMs, supplementing the basic pass-fail qualification testing in IEC 61215.[20]

For a large project, ask:

  • Which BOM was tested?

  • Which BOM will be delivered?

  • Was the change documented?

  • Was further testing required?

  • Does the qualification still cover the product?

For a homeowner, detailed BOM control is usually unrealistic.

Focus on the exact current model and use current specifications, certificates, warranty documents, and installation instructions.

Monitor the System After Installation

Reliability checking does not end when the modules are installed.

Record first-year production so you have a useful baseline.

Do not assume one low-production month means the modules are degrading.

Energy output can change because of:

  • Weather

  • Soiling

  • New shading

  • Inverter downtime

  • Grid curtailment

  • Electrical faults

  • Monitoring errors

Where possible, use weather-adjusted or irradiance-normalized data for long-term performance comparisons.

Investigate:

  • Sudden power drops

  • One weak string

  • Repeated inverter alarms

  • Unusual thermal patterns

  • Visible module damage

A sudden 20% drop over a short period should not simply be called "normal aging." Check the weather, monitoring system, inverter, wiring, strings, and modules.

For larger systems, technicians may use:

  • Infrared imaging

  • IV-curve testing

  • EL imaging

  • Insulation testing

These tests answer different questions.

The U.S. Department of Energy describes PV reliability work as studying the causes of degradation and power loss, improving durability, using field data, and developing standards that reduce maintenance risk and unexpected outages.[21]

A simple diagnostic process is:

1. Notice an unusual change.

2. Confirm that the change is real.

3. Find whether the problem is at system, string, module, cell, or connection level.

4. Choose the right test for that problem.

Use a Simple Evidence Matrix

You do not need to create a fake "reliability score" and pretend it is an industry standard.

Instead, use a simple evidence matrix.

Area

Better Evidence

Warning Sign

Certification

Current certificate covering the exact model or clearly defined product family

Certificate for a vaguely similar module

Test results

Test conditions, duration, initial and final results

"Passed" with no useful detail

Damp heat

Duration, temperature, humidity, power and post-test condition

Only a "humidity resistant" claim

Thermal cycling

Cycle count plus power, EL and connection results

Cycle number used as a marketing slogan

PID

Voltage, polarity, temperature, humidity, duration and power loss

"Anti-PID" with no test conditions

Mechanical load

Load result linked to a clear mounting method

Large Pa number with no clamp information

Hail

Hail size, speed and post-impact EL or electrical results

"Hail resistant" with no numbers

Field data

Relevant design, climate, years, sample size and failure data

Small case study from an old product generation

Warranty

Clear coverage, legal provider, claim process and costs

Warranty length shown without full terms

Factory and BOM

Traceability and controlled material changes

Current delivered BOM cannot be identified

 

Some gaps need to be resolved before purchase rather than averaged away.

Examples include:

  • The certificate does not clearly cover the product

  • Required safety qualification is missing

  • The test report belongs to a substantially different design

  • The tested BOM cannot be linked to the delivered module

  • Connector compatibility is unclear

  • The company responsible for the warranty cannot be identified

A Simple Comparison Example

Imagine two 585 W modules for a hot and humid commercial rooftop.

Module A has current IEC qualification, a reported 1.0% power loss after damp-heat testing, 10 years of field data from an older product generation, and a recent BOM change.

Module B has current IEC qualification, a reported 1.8% power loss after a longer damp-heat test, three years of field data, and current BOM information that matches the extended-test samples.

You cannot simply choose Module A because 1.0% is lower than 1.8%.

The damp-heat test durations were different.

You also cannot choose Module A only because it has 10 years of field history.

The older field data may not fully represent the current BOM.

Module B is not automatically the winner either.

Three years of field history is still short.

The comparison has shown you what to ask next:

  • How was Module A's current BOM tested?

  • How relevant is Module A's old field data to the current product?

  • Will Module B's newer design remain stable after the first few years?

A good reliability comparison does not always give an instant winner.

It shows you where the important uncertainty remains.

What Matters Most

For a Homeowner

  • Exact-model certification

  • Tests relevant to the local climate

  • Clear product-warranty terms

  • A clear warranty provider and claim route

  • An installer who follows the module manual

For a Commercial Project

Add:

  • Detailed degradation data

  • PID results

  • Extended stress testing

  • Factory quality records

  • BOM control

  • Sample-selection information

For a Utility-Scale Project

Also consider:

  • Independent laboratory testing

  • Batch sampling

  • Pre-shipment EL inspection

  • Factory audits

  • Field degradation analysis

  • Supplier change control

  • Delivery inspection

The larger the investment, the deeper the reliability review should be.

But deeper checking does not mean collecting every test report available.

Start with the main risks at the project site.

Then ask for the strongest evidence that answers those risks.

Final Answer

To compare solar module reliability, start with the exact model, not the brand name.

Confirm that certificates, test reports, warranties, BOM information, and field data apply to the product being purchased.

Compare actual test conditions and results rather than relying on a simple "PASS" mark.

Give more attention to tests that match the installation site, whether the main risks are heat, humidity, PID, hail, corrosion, or mechanical load.

Separate power degradation from physical failures and safety problems.

Check manufacturing consistency, material changes, installation requirements, and real field performance.

A lower power-loss number is not always better if the test was easier.

Older field data is not always more useful if it belongs to a different design.

Glass-glass construction does not automatically prove higher reliability.

A 30-year warranty does not prove 30 years of measured field performance.

A reliable solar module is not the one with the strongest marketing claim.

It is the module with the fewest important unanswered questions.